Skip to content
Garment Export House

Garment Export House

Learn with us

  • Textile
  • Quality Control
  • Production Management
  • Toggle search form
  • Popular Countries to Source Apparel and Textile Products From Directory
  • What is PD in Fashion Designing? Uncategorized
  • T&A Calendar for Apparel Merchandisers Uncategorized
  • Responsibilities of a General Manager – Industrial Engineering (Garment Manufacturing) Uncategorized
  • What is UBT in Sewing Machine Categories for Garment Manufacturing Uncategorized
  • Sustainable Fashion: Gen AI’s Eco-Friendly Impact on Fashion Manufacturing Uncategorized
  • 15 LEED-certified Bangladeshi garment factories to get Green award in December 2021 – See the list Uncategorized
  • Where to buy export surplus garments in Delhi, India Uncategorized

What is PCD in Garment Industry?

Posted on September 15, 2021July 10, 2026 By Admin No Comments on What is PCD in Garment Industry?

In garment production, PCD stands for Planned Cut Date. The date at which the bulk fabric cutting is planned to start.

Merchants or Planning department prepare the time and action calendar for each order they received from buyer. They need to share some information with buyers like the starting dates of key processes. Cut planned date (PCD) is one such key date in the Time and Action calendar that need to share with the buyer. 


PCD date


Even internal departments should be informed in advance about PCD of the specific orders.

Based on PCD, factories plan their activities related to other orders and plan material sourcing for each order. 

The object is to meet buyer’s shipping date. Once PCD is planned, the pre-production tasks and post- production are planned accordingly. Planning of PCD date is scheduled by planner (production manager) looking into the ex-factory date and factory capacity for the specific date. But final date of the PCD is rediscussed during the preproduction meeting and reconfirmed by all the concerned team, looking into the fabric availability, availability of the cutting room capacity and need of production start. 

Author

  • Admin
    Admin

    Admin user

Uncategorized Tags:Full Form, Production Planning

Post navigation

Previous Post: What is AQL (Acceptable Quality Level)?
Next Post: Full form of CMT in Garment Manufacturing Supply Chain

Related Posts

  • Garment Buying Houses/Buying Agents in Delhi, NCR Uncategorized
  • What is the Full Form of POM in Garments? Uncategorized
  • Full form of SEDEX Uncategorized
  • Guess Partners With QIMA To Digitize Quality Control Program Uncategorized
  • Responsibilities of a General Manager – Industrial Engineering (Garment Manufacturing) Uncategorized
  • CAVA Athleisure Introduces ADPT™ an Innovative Fabric Blend Uncategorized

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest Posts

  • 20 Types of Fashion Accessories: A Complete Guide
  • Top Garment Buyers in Bangladesh
  • Top 20 Garment Export Houses in India
  • Quality Control vs. Quality Assurance in the Garment Supply Chain
  • How a Custom Clothing Manufacturer Brings Your Designs to Life

Banner ads

  • Top 20 Garment Export Houses in India Directory
  • Primark Commits to Making More Sustainable Clothings Uncategorized
  • List of Trims and Accessories Used in Garments Uncategorized
  • Ten Innovators Join the Fashion for Good Innovation Programme in 2024 Uncategorized
  • Future Market Insights Excerpts on T-shirt Printing Market Uncategorized
  • Color Fastness to Wash: Enhancing Fabric Durability and Appearance Uncategorized
  • Online Calculators for Garment Industry Professonals Uncategorized
  • Abrasion and Pilling Testing for Textile Materials | Martindale Abrasion and Pilling Tester Textile
  • Directory

Disclaimer

Copyright © 2026 ocs.hostingersite.com.

Powered by PressBook News WordPress theme