Skip to content
Garment Export House

Garment Export House

Learn with us

  • Textile
  • Quality Control
  • Production Management
  • Toggle search form
  • What is CIF in the Apparel Industry? Textile
  • Functions of the Quality Control Department in the Garment Industry Uncategorized
  • What is Basic Block in Garment Pattern Making? Uncategorized
  • What is Mending in Garment Repairing Process? Uncategorized
  • List of Trims and Accessories Used in Garments Uncategorized
  • Laguna Clothing’s New Factory in Bangalore, India Uncategorized
  • What is the Meaning of SMV in Garments? Uncategorized
  • PP Meeting in Garment Manufacturing – All That You Need Know Industrial Engineering

What is PCD in Garment Industry?

Posted on September 15, 2021July 10, 2026 By Admin No Comments on What is PCD in Garment Industry?

In garment production, PCD stands for Planned Cut Date. The date at which the bulk fabric cutting is planned to start.

Merchants or Planning department prepare the time and action calendar for each order they received from buyer. They need to share some information with buyers like the starting dates of key processes. Cut planned date (PCD) is one such key date in the Time and Action calendar that need to share with the buyer. 


PCD date


Even internal departments should be informed in advance about PCD of the specific orders.

Based on PCD, factories plan their activities related to other orders and plan material sourcing for each order. 

The object is to meet buyer’s shipping date. Once PCD is planned, the pre-production tasks and post- production are planned accordingly. Planning of PCD date is scheduled by planner (production manager) looking into the ex-factory date and factory capacity for the specific date. But final date of the PCD is rediscussed during the preproduction meeting and reconfirmed by all the concerned team, looking into the fabric availability, availability of the cutting room capacity and need of production start. 

Author

  • Admin
    Admin

    Admin user

Uncategorized Tags:Full Form, Production Planning

Post navigation

Previous Post: What is AQL (Acceptable Quality Level)?
Next Post: Full form of CMT in Garment Manufacturing Supply Chain

Related Posts

  • What is Bow and Skew in Fabric? Uncategorized
  • Application of Pre-Determined Motion Time System to Develop a Standard Data System … Uncategorized
  • B2B Portals for Yarn and Textile Sourcing and Selling Uncategorized
  • Why You Need IE Department in a Garment Factory? Uncategorized
  • Top Countries Exported Apparels to U.S. (By Quantity) in Year 2023 Uncategorized
  • Snapshot of the Indian Textile and Garment Industry Uncategorized

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest Posts

  • 20 Types of Fashion Accessories: A Complete Guide
  • Top Garment Buyers in Bangladesh
  • Top 20 Garment Export Houses in India
  • Quality Control vs. Quality Assurance in the Garment Supply Chain
  • How a Custom Clothing Manufacturer Brings Your Designs to Life

  • Ten Innovators Join the Fashion for Good Innovation Programme in 2024 Uncategorized
  • i-Smart sewing operator rating system by NIFT innovative team Uncategorized
  • Top Garment Export Houses in Delhi NCR, India Uncategorized
  • What Documents are Required in Garment Export Business? Uncategorized
  • Pantone’s Fashion Colour Trend Report for Spring/Summer 2022 Uncategorized
  • T&A Calendar for Apparel Merchandisers Uncategorized
  • What type of fiber present in pants? Uncategorized
  • Ready for Dyeing (RFD) Fabric Uncategorized
  • Directory

Disclaimer

Copyright © 2026 ocs.hostingersite.com.

Powered by PressBook News WordPress theme